550mm 5DoF Wiring

Last modified by Eric Nantel on 2024/06/28 12:19

IMPORTANT : Proceed with connecting each actuator's power & ethernet cables from one servo to the next. They will be held with Zip-Ties later.

Wiring - Assembly A
Step 1/5
Arm
Assembly
LSS-P-ETH-500
CAN Cable 500mm
LSS-P-XT60-500
Power Cable 500mm
DH-20M50053
2M USB-C Cable

Joint #1Joint #2

Wiring - Assembly B
Step 2/5
Wiring
Assembly A
LSS-P-ETH-500
CAN Cable 500mm
LSS-P-XT60-500
Power Cable 500mm

Joint #2Joint #3

Wiring - Assembly C
Step 3/5
Wiring
Assembly B
LSS-P-ETH-650
CAN Cable 650mm
LSS-P-XT60-650
Power Cable 650mm

Joint #3Joint #5

Wiring - Assembly D
Step 4/5
Wiring
Assembly C
LSS-P-ETH-500
CAN Cable 500mm
LSS-P-XT60-500
Power Cable 500mm

Joint #5Joint #6

IMPORTANT : In order to prevent the wiring from being too short and breaking during movement, make sure to have the wire length as short as possible between the actuator's connection points and the Zip-Tie. This will leave the maximum of length of cable between the joints to move properly.

Wiring - Assembly E
Step 5/5
Wiring
Assembly D
CT019B
Zip-Tie (4.5mm wide)

View 1View 2

Tags:
Created by Eric Nantel on 2024/04/19 14:02
Copyright RobotShop 2018